THE BILL ITSELF
CS/CS/HB 1139
Impact Fees
1
A bill to be entitled
2
An act relating to impact fees; amending s. 163.3164,
3
F.S.; defining the term "plan-based methodology";
4
amending s. 163.3177, F.S.; providing requirements for
5
coordination mechanisms that are required for certain
6
agreements required as part of the intergovernmental
7
coordination element of a comprehensive plan; amending
8
s. 163.3180, F.S.; requiring that a plan-based
9
methodology used for certain interlocal agreements be
10
consistent with certain comprehensive plan
11
requirements; prohibiting certain interlocal
12
agreements from extending beyond a specified date;
13
deleting an exception to an applicability provision
14
relating to concurrency; amending s. 163.31801, F.S.;
15
defining the term "extraordinary circumstances";
16
requiring that a demonstrated-need study use a plan-
17
based methodology for a certain purpose; requiring
18
that certain capacity standards be specified in a
19
certain impact fee study; requiring that a
20
demonstrated-need study be accompanied by a certain
21
declaration; requiring local governments, school
22
districts, and special districts to use localized data
23
for a certain purpose; prohibiting local governments,
24
school districts, and special districts from using
25
certain data for a specified purpose; prohibiting
26
local governments, school districts, and special
27
districts from including certain deductions in certain
28
impact fee increases and from increasing impact fee
29
rates beyond certain phase-in limitations by more than
30
a specified percentage within a certain timeframe;
31
providing that a prevailing petitioner is entitled to
32
an impact fee overpayment refund, with interest, under
33
certain circumstances; requiring local governments,
34
school districts, and special districts to issue such
35
refunds within a specified timeframe; providing that
36
certain prevailing petitioners are entitled to
37
reasonable attorney fees and costs; amending s.
38
212.055, F.S.; conforming a cross-reference; providing
39
an effective date.
41
Be It Enacted by the Legislature of the State of Florida:
43
Section 1. Present subsections (39) through (54) of
44
section 163.3164, Florida Statutes, are redesignated as
45
subsections (40) through (55), respectively, and a new
46
subsection (39) is added to that section, to read:
47
163.3164 Community Planning Act; definitions.—As used in
48
this act:
49
(39) "Plan-based methodology" means a study methodology
50
that uses the most recent and localized data to project growth
51
within a jurisdiction over a 10-year period, anticipate capacity
52
impacts on relevant systems which will be created by the
53
projected growth, and establish a list of capital projects to be
54
constructed or purchased in a defined time period to mitigate
55
the anticipated capacity impacts as part of a new or updated
56
impact fee study. The capital projects identified in a county or
57
municipal impact fee study and any necessary interlocal
58
agreement must comport with the requirements of s.
59
163.3177(6)(h).
60
Section 2. Paragraph (h) of subsection (6) of section
61
163.3177, Florida Statutes, is amended to read:
62
163.3177 Required and optional elements of comprehensive
63
plan; studies and surveys.—
64
(6) In addition to the requirements of subsections (1)-
65
(5), the comprehensive plan shall include the following
66
elements:
67
(h)1. An intergovernmental coordination element showing
68
relationships and stating principles and guidelines to be used
69
in coordinating the adopted comprehensive plan with the plans of
70
school boards, regional water supply authorities, and other
71
units of local government providing services but not having
72
regulatory authority over the use of land, with the
73
comprehensive plans of adjacent municipalities, the county,
74
adjacent counties, or the region, with the state comprehensive
75
plan and with the applicable regional water supply plan approved
76
pursuant to s. 373.709, as the case may require and as such
77
adopted plans or plans in preparation may exist. This element of
78
the local comprehensive plan must demonstrate consideration of
79
the particular effects of the local plan, when adopted, upon the
80
development of adjacent municipalities, the county, adjacent
81
counties, or the region, or upon the state comprehensive plan,
82
as the case may require.
83
a. The intergovernmental coordination element must provide
84
procedures for identifying and implementing joint planning
85
areas, especially for the purpose of annexation, municipal
86
incorporation, and joint infrastructure service areas.
87
b. The intergovernmental coordination element shall
88
provide for a dispute resolution process, as established
89
pursuant to s. 186.509, for bringing intergovernmental disputes
90
to closure in a timely manner.
91
c. The intergovernmental coordination element shall
92
provide for interlocal agreements as established pursuant to s.
93
333.03(1)(b).
94
2. The intergovernmental coordination element shall also
95
state principles and guidelines to be used in coordinating the
96
adopted comprehensive plan with the plans of school boards and
97
other units of local government providing facilities and
98
services but not having regulatory authority over the use of
99
land. In addition, the intergovernmental coordination element
100
must describe joint processes for collaborative planning and
101
decisionmaking on population projections and public school
102
siting, the location and extension of public facilities subject
103
to concurrency, and siting facilities with countywide
104
significance, including locally unwanted land uses whose nature
105
and identity are established in an agreement.
106
3. Within 1 year after adopting their intergovernmental
107
coordination elements, each county, all the municipalities
108
within that county, the district school board, and any unit of
109
local government service providers in that county shall
110
establish by interlocal or other formal agreement executed by
111
all affected entities, the joint processes described in this
112
subparagraph consistent with their adopted intergovernmental
113
coordination elements. The agreement must:
114
a. Ensure that the local government addresses through
115
coordination mechanisms the impacts of development proposed in
116
the local comprehensive plan upon development in adjacent
117
municipalities, the county, adjacent counties, the region, and
118
the state. The area of concern for municipalities shall include
119
adjacent municipalities, the county, and counties adjacent to
120
the municipality. The area of concern for counties shall include
121
all municipalities within the county, adjacent counties, and
122
adjacent municipalities. Such coordination mechanisms must
123
include plans to provide mitigation funding to address any
124
extrajurisdictional impacts of development, consistent with the
125
requirements of s. 163.3180(5)(j).
126
b. Ensure coordination in establishing level of service
127
standards for public facilities with any state, regional, or
128
local entity having operational and maintenance responsibility
129
for such facilities. Section 3. Paragraph (j) of subsection (5) of section
131
163.3180, Florida Statutes, is amended to read:
132
163.3180 Concurrency.—
133
(5)
134
(j)1. If a county and municipality charge the developer of
135
a new development or redevelopment a fee for transportation
136
capacity impacts, the county and municipality must create and
137
execute an interlocal agreement to coordinate the mitigation of
138
their respective transportation capacity impacts.
139
2. The interlocal agreement must, at a minimum:
140
a. Ensure that any new development or redevelopment is not
141
charged twice for the same transportation capacity impacts.
142
b. Establish a plan-based methodology consistent with the
143
requirements of s. 163.3177(6)(h) for determining the legally
144
permissible fee to be charged to a new development or
145
redevelopment.
146
c. Require the county or municipality issuing the building
147
permit to collect the fee, unless agreed to otherwise.
148
d. Provide a method for the proportionate distribution of
149
the revenue collected by the county or municipality to address
150
the transportation capacity impacts of a new development or
151
redevelopment, or provide a method of assigning responsibility
152
for the mitigation of the transportation capacity impacts
153
belonging to the county and the municipality.
154
3. By October 1, 2025, if an interlocal agreement is not
155
executed pursuant to this paragraph:
156
a. The fee charged to a new development or redevelopment
157
shall be based on the transportation capacity impacts
158
apportioned to the county and municipality as identified in the
159
developer's traffic impact study or the mobility plan adopted by
160
the county or municipality.
161
b. The developer shall receive a 10 percent reduction in
162
the total fee calculated pursuant to sub-subparagraph a.
163
c. The county or municipality issuing the building permit
164
must collect the fee charged pursuant to sub-subparagraphs a.
165
and b. and distribute the proceeds of such fee to the county and
166
municipality within 60 days after the developer's payment.
167
4. This paragraph does not apply to:
168
a. A county as defined in s. 125.011(1).
169
b. A county or municipality that has entered into, or
170
otherwise updated, an existing interlocal agreement, as of
171
October 1, 2024, to coordinate the mitigation of transportation
172
impacts. However, if such existing interlocal agreement is
173
terminated, the affected county and municipality that have
174
entered into the agreement are shall be subject to the
175
requirements of this paragraph. An interlocal agreement entered
176
into before October 1, 2024, may not extend beyond October 1,
177
2031 unless the county and municipality mutually agree to extend
178
the existing interlocal agreement before the expiration of the
179
agreement. Section 4. Present paragraphs (a) and (b) of subsection
181
(3) of section 163.31801, Florida Statutes, are redesignated as
182
paragraphs (b) and (c), respectively, a new paragraph (a) is
183
added to that subsection, and paragraph (g) of subsection (6)
184
and subsection (9) of that section are amended, to read:
185
163.31801 Impact fees; short title; intent; minimum
186
requirements; audits; challenges.—
187
(3) For purposes of this section, the term:
188
(a) "Extraordinary circumstances" means measurable effects
189
of development which will require mitigation by the affected
190
local government, school district, or special district and which
191
exceed the total of the current adopted impact fee amount and
192
any increase as provided in paragraphs (6)(c), (d), and (e) in
193
less than 4 years.
194
(6) A local government, school district, or special
195
district may increase an impact fee only as provided in this
196
subsection.
197
(g)1. A local government, school district, or special
198
district may increase an impact fee rate beyond the phase-in
199
limitations established under paragraph (b), paragraph (c),
200
paragraph (d), or paragraph (e) by establishing the need for
201
such increase in full compliance with the requirements of
202
subsection (4), provided the following criteria are met:
203
a. A demonstrated-need study using a plan-based
204
methodology which justifies justifying any increase in excess of
205
those authorized in paragraph (b), paragraph (c), paragraph (d),
206
or paragraph (e) has been completed within the 12 months before
207
the adoption of the impact fee increase and expressly
208
demonstrates the extraordinary circumstances necessitating the
209
need to exceed the phase-in limitations. The capacity standards
210
used to support the existence of such extraordinary
211
circumstances must be specified in the impact fee study adopted
212
under paragraph (4)(a). The demonstrated-need study must be
213
accompanied by a declaration stating how and the timeframe
214
during which the proposed impact fee increase will be used to
215
construct or purchase the improvements necessary to increase
216
capacity. The local government, school district, or special
217
district must use localized data reflecting differences in costs
218
and modality of projects between urban, emerging urban, and
219
rural areas, as applicable within the study area, to project the
220
anticipated growth or capacity impacts which underlie the
221
extraordinary circumstances necessitating the impact fee
222
increase.
223
b. The local government jurisdiction has held at least two
224
publicly noticed workshops dedicated to the extraordinary
225
circumstances necessitating the need to exceed the phase-in
226
limitations set forth in paragraph (b), paragraph (c), paragraph
227
(d), or paragraph (e).
228
c. The impact fee increase ordinance is approved by a
229
unanimous vote of the governing body.
230
2. An impact fee increase approved under this paragraph
231
must be implemented in at least two but not more than four equal
232
annual increments beginning with the date on which the impact
233
fee increase ordinance is adopted.
234
3. A local government, school district, or special
235
district may not:
236
a. Increase an impact fee rate beyond the phase-in
237
limitations under this paragraph if the local government, school
238
district, or special district has not increased the impact fee
239
within the past 5 years. Any year in which the local government,
240
school district, or special district is prohibited from
241
increasing an impact fee because the jurisdiction is in a
242
hurricane disaster area is not included in the 5-year period.
243
b. Use data that is older than 4 years to demonstrate
244
extraordinary circumstances.
245
c. Include in the impact fee increase any deduction
246
authorized by a previous or existing impact fee.
247
d. Increase an impact fee rate beyond the phase-in
248
limitations under this paragraph by more than 100 percent
249
divided equally over a 4-year period.
250
(9) In any action challenging an impact fee or the
251
government's failure to provide required dollar-for-dollar
252
credits for the payment of impact fees as provided in s.
253
163.3180(6)(h)2.b.:,
254
(a) The government has the burden of proving by a
255
preponderance of the evidence that the imposition or amount of
256
the fee or credit meets the requirements of state legal
257
precedent and this section. The court may not use a deferential
258
standard for the benefit of the government. If the court
259
determines that the petitioner made an overpayment due to an
260
improperly assessed impact fee, the petitioner is entitled to a
261
refund in the amount of the overpayment with interest, with such
262
interest amount determined by the court. The local government,
263
school district, or special district that assessed the impact
264
fee must issue the refund within 90 days after the judgment
265
becomes final.
266
(b) A prevailing petitioner who is a resident of or an
267
owner of a business located within the jurisdiction of the local
268
government, school district, or special district that imposed
269
the impact fee in violation of this section is entitled to
270
reasonable attorney fees and costs. Such petitioner is further
271
entitled to reasonable attorney fees and costs in any subsequent
272
action necessary to collect a refund ordered by the court for
273
any impact fee overpayment.
274
Section 5. Paragraph (d) of subsection (2) of section
275
212.055, Florida Statutes, is amended to read:
276
212.055 Discretionary sales surtaxes; legislative intent;
277
authorization and use of proceeds.—It is the legislative intent
278
that any authorization for imposition of a discretionary sales
279
surtax shall be published in the Florida Statutes as a
280
subsection of this section, irrespective of the duration of the
281
levy. Each enactment shall specify the types of counties
282
authorized to levy; the rate or rates which may be imposed; the
283
maximum length of time the surtax may be imposed, if any; the
284
procedure which must be followed to secure voter approval, if
285
required; the purpose for which the proceeds may be expended;
286
and such other requirements as the Legislature may provide.
287
Taxable transactions and administrative procedures shall be as
288
provided in s. 212.054.
289
(2) LOCAL GOVERNMENT INFRASTRUCTURE SURTAX.—
290
(d) The proceeds of the surtax authorized by this
291
subsection and any accrued interest shall be expended by the
292
school district, within the county and municipalities within the
293
county, or, in the case of a negotiated joint county agreement,
294
within another county, to finance, plan, and construct
295
infrastructure; to acquire any interest in land for public
296
recreation, conservation, or protection of natural resources or
297
to prevent or satisfy private property rights claims resulting
298
from limitations imposed by the designation of an area of
299
critical state concern; to provide loans, grants, or rebates to
300
residential or commercial property owners who make energy
301
efficiency improvements to their residential or commercial
302
property, if a local government ordinance authorizing such use
303
is approved by referendum; or to finance the closure of county-
304
owned or municipally owned solid waste landfills that have been
305
closed or are required to be closed by order of the Department
306
of Environmental Protection. Any use of the proceeds or interest
307
for purposes of landfill closure before July 1, 1993, is
308
ratified. The proceeds and any interest may not be used for the
309
operational expenses of infrastructure, except that a county
310
that has a population of fewer than 75,000 and that is required
311
to close a landfill may use the proceeds or interest for long-
312
term maintenance costs associated with landfill closure.
313
Counties, as defined in s. 125.011, and charter counties may, in
314
addition, use the proceeds or interest to retire or service
315
indebtedness incurred for bonds issued before July 1, 1987, for
316
infrastructure purposes, and for bonds subsequently issued to
317
refund such bonds. Any use of the proceeds or interest for
318
purposes of retiring or servicing indebtedness incurred for
319
refunding bonds before July 1, 1999, is ratified.
320
1. For the purposes of this paragraph, the term
321
"infrastructure" means:
322
a. Any fixed capital expenditure or fixed capital outlay
323
associated with the construction, reconstruction, or improvement
324
of public facilities that have a life expectancy of 5 or more
325
years, any related land acquisition, land improvement, design,
326
and engineering costs, and all other professional and related
327
costs required to bring the public facilities into service. For
328
purposes of this sub-subparagraph, the term "public facilities"
329
means facilities as defined in s. 163.3164(42) s. 163.3164(41),
330
s. 163.3221(13), or s. 189.012(5), and includes facilities that
331
are necessary to carry out governmental purposes, including, but
332
not limited to, fire stations, general governmental office
333
buildings, and animal shelters, regardless of whether the
334
facilities are owned by the local taxing authority or another
335
governmental entity.
336
b. A fire department vehicle, an emergency medical service
337
vehicle, a sheriff's office vehicle, a police department
338
vehicle, or any other vehicle, and the equipment necessary to
339
outfit the vehicle for its official use or equipment that has a
340
life expectancy of at least 5 years.
341
c. Any expenditure for the construction, lease, or
342
maintenance of, or provision of utilities or security for,
343
facilities, as defined in s. 29.008.
344
d. Any fixed capital expenditure or fixed capital outlay
345
associated with the improvement of private facilities that have
346
a life expectancy of 5 or more years and that the owner agrees
347
to make available for use on a temporary basis as needed by a
348
local government as a public emergency shelter or a staging area
349
for emergency response equipment during an emergency officially
350
declared by the state or by the local government under s.
351
252.38. Such improvements are limited to those necessary to
352
comply with current standards for public emergency evacuation
353
shelters. The owner must enter into a written contract with the
354
local government providing the improvement funding to make the
355
private facility available to the public for purposes of
356
emergency shelter at no cost to the local government for a
357
minimum of 10 years after completion of the improvement, with
358
the provision that the obligation will transfer to any
359
subsequent owner until the end of the minimum period.
360
e. Any land acquisition expenditure for a residential
361
housing project in which at least 30 percent of the units are
362
affordable to individuals or families whose total annual
363
household income does not exceed 120 percent of the area median
364
income adjusted for household size, if the land is owned by a
365
local government or by a special district that enters into a
366
written agreement with the local government to provide such
367
housing. The local government or special district may enter into
368
a ground lease with a public or private person or entity for
369
nominal or other consideration for the construction of the
370
residential housing project on land acquired pursuant to this
371
sub-subparagraph.
372
f. Instructional technology used solely in a school
373
district's classrooms. As used in this sub-subparagraph, the
374
term "instructional technology" means an interactive device that
375
assists a teacher in instructing a class or a group of students
376
and includes the necessary hardware and software to operate the
377
interactive device. The term also includes support systems in
378
which an interactive device may mount and is not required to be
379
affixed to the facilities.
380
2. For the purposes of this paragraph, the term "energy
381
efficiency improvement" means any energy conservation and
382
efficiency improvement that reduces consumption through
383
conservation or a more efficient use of electricity, natural
384
gas, propane, or other forms of energy on the property,
385
including, but not limited to, air sealing; installation of
386
insulation; installation of energy-efficient heating, cooling,
387
or ventilation systems; installation of solar panels; building
388
modifications to increase the use of daylight or shade;
389
replacement of windows; installation of energy controls or
390
energy recovery systems; installation of electric vehicle
391
charging equipment; installation of systems for natural gas fuel
392
as defined in s. 206.9951; and installation of efficient
393
lighting equipment.
394
3. Notwithstanding any other provision of this subsection,
395
a local government infrastructure surtax imposed or extended
396
after July 1, 1998, may allocate up to 15 percent of the surtax
397
proceeds for deposit into a trust fund within the county's
398
accounts created for the purpose of funding economic development
399
projects having a general public purpose of improving local
400
economies, including the funding of operational costs and
401
incentives related to economic development. The ballot statement
402
must indicate the intention to make an allocation under the
403
authority of this subparagraph.
404
4. Surtax revenues that are shared with eligible charter
405
schools pursuant to paragraph (c) shall be allocated among such
406
schools based on each school's proportionate share of total
407
school district capital outlay full-time equivalent enrollment
408
as adopted by the education estimating conference established in
409
s. 216.136. Surtax revenues must be expended by the charter
410
school in a manner consistent with the allowable uses provided
411
in s. 1013.62(4). All revenues and expenditures shall be
412
accounted for in a charter school's monthly or quarterly
413
financial statement pursuant to s. 1002.33(9). If a school's
414
charter is not renewed or is terminated and the school is
415
dissolved under the provisions of law under which the school was
416
organized, any unencumbered funds received under this paragraph
417
shall revert to the sponsor.
418
Section 6. This act shall take effect July 1, 2026.