THE BILL ITSELF
CS/CS/CS/HB 927
Local Land Planning and Development
2
An act relating to local land planning and
3
development; amending ss. 125.022 and 166.033, F.S.;
4
requiring each county and municipality, respectively,
5
of a specified size to create and implement a program
6
for the purpose of making development preapplication
7
consultation services available at an applicant's
8
request; providing that specified provisions may not
9
be construed to affect or require the modification of
10
certain county or municipality programs that make
11
available the same or substantially similar
12
development preapplication consulting services if such
13
county or municipality's program existed before a
14
specified date; limiting such preapplication
15
consultation services to applications for certain
16
permits; authorizing a county or municipality to use a
17
qualified contractor or qualified contractor firm to
18
fulfill specified preapplication services
19
requirements; specifying minimum requirements for a
20
development preapplication consultation services
21
program; requiring a county or municipality to take
22
certain actions if an applicant chooses to use the
23
development preapplication consultation services
24
program; requiring a county or municipality to
25
approve, approve with conditions, or deny an
26
applicant's completed application within a specified
27
timeframe; requiring that an application be deemed
28
approved by operation of law without conditions and
29
proceed in a specified manner if a county or
30
municipality fails to make a certain determination
31
within a specified timeframe; providing construction;
32
specifying that certain requirements apply if an
33
applicant for a development permit or development
34
order is not eligible for, does not request, or elects
35
not to use the county's or municipality's
36
preapplication consulting services program; creating
37
s. 163.3169, F.S.; defining terms; requiring a local
38
government to establish a registry of a specified
39
number of qualified contractors or qualified
40
contractor firms to conduct certain preapplication
41
services; prohibiting a qualified contractor or
42
qualified contractor firm from having a conflict of
43
interest; authorizing an applicant to use a qualified
44
contractor that is not on the registry if a conflict
45
of interest exists; authorizing a local government to
46
enter into a certain agreement with another local
47
government under certain circumstances; prohibiting a
48
local government from adding its own employees to the
49
registry; authorizing an applicant to retain a
50
qualified contractor or qualified contractor firm of
51
his or her choosing for preapplication consultation
52
services under certain circumstances; prohibiting a
53
local government from conditioning, denying, or
54
delaying an applicant's selection or use of a
55
qualified contractor or qualified contractor firm;
56
specifying that the applicant is responsible for all
57
fees and costs associated with using a qualified
58
contractor of his or her choice; requiring a local
59
government to make certain resources available if an
60
applicant uses a qualified contractor or qualified
61
contractor firm of his or her choosing to perform
62
preapplication consultation services; providing an
63
exception; providing construction; providing that
64
specified requirements relating to the use of
65
qualified contractors or qualified contractor firms to
66
perform development preapplication consultation
67
services do not apply to certain property identified
68
within a permit application; providing applicability;
69
providing construction; amending s .177.071, F.S.;
70
authorizing a governing body to use a specified
71
registry to supplement local government staff
72
resources; prohibiting a local government from
73
creating, establishing, or applying any additional
74
local procedure or condition for the administrative
75
approval of a plat or replat which is inconsistent
76
with specified provisions; authorizing the
77
administrative authority to receive and act upon
78
certain financial assurances; providing requirements
79
for a local government's acceptance of certain
80
financial assurances; amending s. 177.073, F.S.;
81
revising the definition of the term "applicant";
82
requiring the governing body of certain local
83
governments and counties to include certain
84
developments in a program that expedites the process
85
for issuing building permits for planned unit
86
developments or phases of a community or subdivision;
87
specifying automatic actions in the event the local
88
government fails to adopt, update, or modify a certain
89
program by a specified date; defining the term
90
"conflict of interest"; providing construction;
91
requiring a governing body to create a two-step
92
application process for stabilized access roads that
93
can support emergency vehicles; revising requirements
94
for such application process; authorizing an applicant
95
to use a qualified contractor for land use approvals
96
under certain circumstances; authorizing a governing
97
body to use the qualified contractor registry
98
established pursuant to this act to supplement staff
99
resources; deleting provisions prohibiting the use of
100
a qualified contractor with a conflict of interest;
101
defining the term "approved plans"; providing
102
construction; prohibiting a local government from
103
conditioning, delaying, withholding, or denying the
104
issuance of certain permits under certain
105
circumstances; providing applicability; providing
106
construction; authorizing a local government to waive
107
a certain bond requirement under certain
108
circumstances; revising the circumstances under which
109
an applicant has a vested right in a preliminary plat;
110
providing an effective date.
112
Be It Enacted by the Legislature of the State of Florida:
114
Section 1. Section 125.022, Florida Statutes, is amended
115
to read:
116
125.022 Development permits and orders; development
117
preapplication consulting services program required.—
118
(1)(a) By January 1, 2027, each county with a population
119
of 75,000 or greater shall create and implement a program for
120
the purpose of making available development preapplication
121
consultation services at an applicant's request. This subsection
122
may not be construed to affect or require the modification of a
123
county program that makes available the same or substantially
124
similar development preapplication consulting services to an
125
applicant for a development permit or development order,
126
including a program that requires mandatory preapplication
127
meetings for specified types of developments, if such county
128
program exists on or before July 1, 2026.
129
1. The preapplication consultation services authorized in
130
this subsection are limited to those applications for permits as
131
defined in s. 163.3169.
132
2. The county may use a qualified contractor or a
133
qualified contractor firm as defined in s. 163.3169 to fulfill
134
the preapplication consultation services required in this
135
subsection.
136
(b) A development preapplication consultation services
137
program must, at minimum, provide all of the following:
138
1. The minimum information that must be submitted in an
139
application for a permit as defined in s. 163.3169.
140
2. The review and precertification of completeness of the
141
application and all related documents, including site
142
engineering plans or site plans or their functional equivalent,
143
or plats, and their compliance with all relevant existing land
144
development regulations.
145
(c) If an applicant chooses to use the development
146
preapplication consultation services program, the county, upon
147
receipt of the proposed development application, shall confirm
148
receipt, verify completeness, and issue a written notification
149
to the applicant indicating that all required information has
150
been submitted, or specify in writing with particularity any
151
deficiencies in the application, within 5 business days. If the
152
application is deficient, the applicant has 30 days to address
153
the deficiencies by submitting the required additional
154
information. If the county fails to issue the written
155
notification within 5 business days, the application is deemed
156
complete by operation of law without conditions, and the county
157
must process the application as required in paragraph (d).
158
(d)1. Upon receipt of the applicant's completed
159
application, the county must process the application for final
160
action and must approve, approve with conditions, or deny the
161
application within 45 days after submission of a complete
162
application, except the county may not review again those plans
163
specified in subparagraph (b)2.
164
2. If the county fails to take final action to approve,
165
approve with conditions, or deny the application within 45 days,
166
the applicant shall notify the county in writing. If the county
167
fails to respond within 10 days, the application is deemed
168
approved by operation of law without conditions, and the
169
applicant is entitled to proceed with the proposed activity or
170
development as though the county had granted unconditional
171
approval. Approval pursuant to this subparagraph may not be
172
construed to relieve the applicant of the obligation to comply
173
with all other applicable federal, state, and local laws,
174
regulations, and ordinances.
175
(2) If an applicant for a development permit or
176
development order is not eligible, does not request, or elects
177
not to use the county's development preapplication consulting
178
services program pursuant to subsection (1), all of the
179
following requirements shall apply:
180
(a)(1) A county shall specify in writing the minimum
181
information that must be submitted in an application for a
182
zoning approval, rezoning approval, subdivision approval,
183
certification, special exception, or variance. A county shall
184
make the minimum information available for inspection and
185
copying at the location where the county receives applications
186
for development permits and orders, provide the information to
187
the applicant at a preapplication meeting, or post the
188
information on the county's website.
189
(b)1.(2) Within 5 business days after receiving an
190
application for approval of a development permit or development
191
order, a county shall confirm receipt of the application using
192
contact information provided by the applicant. Within 30 days
193
after receiving an application for approval of a development
194
permit or development order, a county must review the
195
application for completeness and issue a written notification to
196
the applicant indicating that all required information is
197
submitted or specify in writing with particularity any areas
198
that are deficient. If the application is deficient, the
199
applicant has 30 days to address the deficiencies by submitting
200
the required additional information.
201
2. For applications that do not require final action
202
through a quasi-judicial hearing or a public hearing, the county
203
must approve, approve with conditions, or deny the application
204
for a development permit or development order within 120 days
205
after the county has deemed the application complete.
206
3. For applications that require final action through a
207
quasi-judicial hearing or a public hearing, the county must
208
approve, approve with conditions, or deny the application for a
209
development permit or development order within 180 days after
210
the county has deemed the application complete.
211
4. Both parties may agree in writing or in a public
212
meeting or hearing to an extension of time, particularly in the
213
event of a force majeure or other extraordinary circumstance. An
214
approval, approval with conditions, or denial of the application
215
for a development permit or development order must include
216
written findings supporting the county's decision.
218
The timeframes contained in this paragraph subsection do not
219
apply in an area of critical state concern, as designated in s.
220
380.0552. The timeframes contained in this paragraph subsection
221
restart if an applicant makes a substantive change to the
222
application. As used in this paragraph subsection, the term
223
"substantive change" means an applicant-initiated change of 15
224
percent or more in the proposed density, intensity, or square
225
footage of a parcel.
226
(c)1.(3)(a) When reviewing an application for a
227
development permit or development order that is certified by a
228
professional listed in s. 403.0877, a county may not request
229
additional information from the applicant more than three times,
230
unless the applicant waives the limitation in writing.
231
2.(b) If a county makes a request for additional
232
information and the applicant submits the required additional
233
information within 30 days after receiving the request, the
234
county must review the application for completeness and issue a
235
letter indicating that all required information has been
236
submitted or specify with particularity any areas that are
237
deficient within 30 days after receiving the additional
238
information.
239
3.(c) If a county makes a second request for additional
240
information and the applicant submits the required additional
241
information within 30 days after receiving the request, the
242
county must review the application for completeness and issue a
243
letter indicating that all required information has been
244
submitted or specify with particularity any areas that are
245
deficient within 10 days after receiving the additional
246
information.
247
4.(d) Before a third request for additional information,
248
the applicant must be offered a meeting to attempt to resolve
249
outstanding issues. If a county makes a third request for
250
additional information and the applicant submits the required
251
additional information within 30 days after receiving the
252
request, the county must deem the application complete within 10
253
days after receiving the additional information or proceed to
254
process the application for approval or denial unless the
255
applicant waived the county's limitation in writing as described
256
in subparagraph 1. paragraph (a).
257
5.(e) Except as provided in subsection (4) subsection (7),
258
if the applicant believes the request for additional information
259
is not authorized by ordinance, rule, statute, or other legal
260
authority, the county, at the applicant's request, shall proceed
261
to process the application for approval or denial.
262
(d)(4) A county must issue a refund to an applicant equal
263
to:
264
1.(a) Ten percent of the application fee if the county
265
fails to issue written notification of completeness or written
266
specification of areas of deficiency within 30 days after
267
receiving the application.
268
2.(b) Ten percent of the application fee if the county
269
fails to issue a written notification of completeness or written
270
specification of areas of deficiency within 30 days after
271
receiving the additional information pursuant to subparagraph
272
(c)2. paragraph (3)(b).
273
3.(c) Twenty percent of the application fee if the county
274
fails to issue a written notification of completeness or written
275
specification of areas of deficiency within 10 days after
276
receiving the additional information pursuant to subparagraph
277
(c)3. paragraph (3)(c).
278
4.(d) Fifty percent of the application fee if the county
279
fails to approve, approves with conditions, or denies the
280
application within 30 days after conclusion of the 120-day
281
timeframe specified in subparagraph (b)2. or the 180-day
282
timeframe specified in subparagraph (b)3. subsection (2).
283
5.(e) One hundred percent of the application fee if the
284
county fails to approve, approves with conditions, or denies an
285
application 31 days or more after conclusion of the 120-day
286
timeframe specified in subparagraph (b)2. or the 180-day
287
timeframe specified in subparagraph (b)3. subsection (2).
289
A county is not required to issue a refund if the applicant and
290
the county agree to an extension of time, the delay is caused by
291
the applicant, or the delay is attributable to a force majeure
292
or other extraordinary circumstance.
293
(e)(5) When a county denies an application for a
294
development permit or development order, the county shall give
295
written notice to the applicant. The notice must include a
296
citation to the applicable portions of an ordinance, rule,
297
statute, or other legal authority for the denial of the permit
298
or order.
299
(3)(6) As used in this section, the terms "development
300
permit" and "development order" have the same meaning as in s.
301
163.3164, but do not include building permits.
302
(4)(7) For any development permit application filed with
303
the county after July 1, 2012, a county may not require as a
304
condition of processing or issuing a development permit or
305
development order that an applicant obtain a permit or approval
306
from any state or federal agency unless the agency has issued a
307
final agency action that denies the federal or state permit
308
before the county action on the local development permit.
309
(5)(8) Issuance of a development permit or development
310
order by a county does not in any way create any rights on the
311
part of the applicant to obtain a permit from a state or federal
312
agency and does not create any liability on the part of the
313
county for issuance of the permit if the applicant fails to
314
obtain requisite approvals or fulfill the obligations imposed by
315
a state or federal agency or undertakes actions that result in a
316
violation of state or federal law. A county shall attach such a
317
disclaimer to the issuance of a development permit and shall
318
include a permit condition that all other applicable state or
319
federal permits be obtained before commencement of the
320
development.
321
(6)(9) This section does not prohibit a county from
322
providing information to an applicant regarding what other state
323
or federal permits may apply.
324
Section 2. Section 163.3169, Florida Statutes, is created
325
to read:
326
163.3169 Using qualified contractors in development order
327
preapplication review.—
328
(1) DEFINITIONS.—As used in this section, the term:
329
(a) "Applicant" means a person or legal entity having a
330
legal or equitable ownership interest in real property, or an
331
authorized agent acting on behalf of such person or entity,
332
which applies for a land development approval from the local
333
government pursuant to this section.
334
(b) "Application" means a properly completed and submitted
335
request for a permit, as defined herein, on behalf of an
336
applicant which includes an affidavit from a qualified
337
contractor as required by this section. The term does not
338
include plans or permits as reviewed under s. 553.791.
339
(c) "Conflict of interest" has the same meaning as in s.
340
112.312 and includes conflicts of interest recognized under
341
applicable licensing or certification standards applicable to
342
the qualified contractor.
343
(d) "Development services office" means the entity,
344
office, division, or department of a local government which is
345
responsible for reviewing applications for compliance with the
346
local government's land development regulations and other
347
applicable federal, state, and local requirements. This office
348
may be substantively identical to or housed within the local
349
government's planning and zoning department.
350
(e) "Development services official" means the individual
351
in the development services office of the governing jurisdiction
352
who is responsible for the direct regulatory administration or
353
supervision of the review and approval process required to
354
indicate compliance with applicable land development
355
regulations. The term includes any duly authorized designee of
356
such person. This individual may be the executive director of
357
the governing body of a local government or the division
358
director of the local government's planning and zoning
359
department.
360
(f) "Final plat" has the same meaning as in s. 177.073.
361
(g) "Governing body" has the same meaning as in s.
362
163.3164.
363
(h) "Land development regulations" has the same meaning as
364
in s. 163.3164, but excludes building permits and plans subject
365
to s. 553.791.
366
(i) "Local government" means:
367
1. A county that has 75,000 or more residents, but does
368
not include a county subject to s. 380.0552; or
369
2. A municipality that has 10,000 or more residents.
370
(j) "Permit" means an authorization, approval, or grant by
371
a local governing body which authorizes the development of land
372
for any site plan or development plan approval, or any
373
subdivision approval, as defined in this section.
374
(k) "Plans" has the same meaning as in s. 177.073.
375
(l) "Plat or replat" has the same meaning as in s.
376
177.031(14).
377
(m) "Preapplication review" means the analysis of a permit
378
conducted by a qualified contractor to ensure compliance with a
379
comprehensive plan, chapter 177, and applicable land development
380
regulations, and which is part of the application as authorized
381
under this section.
382
(n) "Preliminary plat" has the same meaning as in 177.073.
383
(o) "Qualified contractor" means the individual or firm
384
that has demonstrated knowledge of and experience with the types
385
of permits or development approvals specified in this section.
386
The term includes, but is not limited to, any of the following:
387
1. An engineer or engineering firm licensed under chapter
388
471.
389
2. A surveyor or mapper, or a surveyor's or mapper's firm,
390
licensed under chapter 472.
391
3. An architect or architecture firm licensed under part I
392
of chapter 481.
393
4. A landscape architect or a landscape architecture firm
394
registered under part II of chapter 481.
395
5. A planner certified by the American Institute of
396
Certified Planners with at least 5 years of relevant government
397
experience or at least 10 years of experience as an urban
398
planner if not certified.
399
(p) "Qualified contractor firm" means a business
400
organization, including a corporation, partnership, business
401
trust, or other legal entity, which offers services under this
402
section to the public through licensees who act as agents,
403
employees, officers, or partners of the firm. A person who is
404
licensed as an engineer under chapter 471; a surveyor or mapper
405
licensed under chapter 472; an architect licensed under part I
406
of chapter 481; a landscape architect licensed under part II of
407
chapter 481; or who is certified by the American Institute of
408
Certified Planners with at least 5 years of relevant government
409
experience, or at least 10 years of relevant experience as an
410
urban planner if not certified, may act as a qualified
411
contractor for an agent, employee, or officer of the qualified
412
contractor firm.
413
(q) "Site plan or development plan approval" means a site
414
development proposal, or its functional equivalent, including a
415
modification to an existing development approval, which is
416
expressly designated by the local government for administrative
417
review and approval by local government staff or a designated
418
administrative official, without the requirement of approval by
419
an appointed review board or a governing body and which does not
420
materially increase density, intensity, traffic, infrastructure
421
demand, environmental impacts, or significant offsite impacts,
422
and therefore does not require full site plan review or
423
discretionary policy review. The term includes approvals or
424
permits governed by objective, nondiscretionary standards that
425
are designated by the local government for administrative
426
approval by local government staff or an administrative official
427
and which also includes, but is not limited to approvals or
428
permits related to trees, signs, landscaping, and minor
429
modifications.
430
(r) "Subdivision approval" or its functional equivalent,
431
including a modification, means an administrative review process
432
applicable to the division of land into a limited number of lots
433
which does not create new public streets or require significant
434
public infrastructure improvements and does not materially
435
increase development impacts. The term applies only to approvals
436
expressly designated by the local government for administrative
437
review and approval by local government staff or a designated
438
administrator without the requirement of approval by an
439
appointed review board or a governing body. A subdivision
440
qualifies under this definition if it involves a number of lots
441
as specified by the local government, complies with all
442
applicable zoning, dimensional, access utility, and
443
environmental standards, and can be served by existing public
444
facilities or approved private systems, allowing the subdivision
445
to be reviewed for compliance with objective standards of land
446
development code and approved by local government staff or a
447
designated administrative official without requiring
448
discretionary policy determinations.
449
(2) REGISTRY.—
450
(a) By January 1, 2027, a local government shall establish
451
a registry of at least four qualified contractors or two
452
qualified contractor firms which the governing body shall use to
453
supplement the local government's staff resources in ways
454
determined by the governing body upon the written request by an
455
applicant for fulfilling:
456
1. The preapplication consultation services for permits
457
under s. 125.022(1) and s. 166.033(1);
458
2. The requirements of s. 177.073 for processing and
459
expediting the review of an application for a preliminary plat
460
or any plans related to such application; or
461
3. The requirements of s. 177.071 requiring the
462
administrative approval of a plat or replat.
463
(b) A qualified contractor or a qualified contractor firm
464
on the registry which is hired pursuant to this section may not
465
have a conflict of interest. If a prohibitive conflict of
466
interest exists, the applicant may use an otherwise qualified
467
contractor.
468
(c) A local government may enter into an agreement with
469
another local government for the purpose of using public
470
employees who meet the requirements for a qualified contractor
471
to satisfy the minimum numerical requirements for qualified
472
contractors for the registry. A local government may not add its
473
own employees to its own registry.
474
(d) If a local government fails to establish or maintain
475
the registry, an applicant may, at its sole discretion, retain a
476
qualified contractor or a qualified contractor firm of the
477
applicant's choosing to provide preapplication consultation
478
services, provided that the selected qualified contractor or
479
qualified contractor firm does not have a conflict of interest.
480
If a conflict of interest is identified after selection, the
481
applicant must promptly replace the qualified contractor or
482
qualified contractor firm with one that has no conflict of
483
interest.
484
(e) The local government may not condition, deny, or delay
485
the applicant's selection or use of such qualified contractor or
486
qualified contractor firm, and the applicant is responsible for
487
all fees and costs associated with the qualified contractor or
488
qualified contractor firm used in this manner.
489
(f) If an applicant uses a qualified contractor or a
490
qualified contractor firm for such purpose, the local government
491
must provide access to public records and information reasonably
492
necessary to perform preapplication consultation services. This
493
paragraph does not authorize the disclosure of records that are
494
confidential or exempt from public inspection or copying under
495
chapter 119 or any other applicable law, and access to such
496
records is provided only to the extent permitted by law. This
497
paragraph may not be construed to require a local government to
498
violate the licensing terms of proprietary software or related
499
vendor agreements.
500
(3) APPLICABILITY; HISTORIC PRESERVATION.—
501
(a) This section does not apply to an application for a
502
permit if the property that is the subject of the application
503
is:
504
1. Individually listed in the National Register of
505
Historic Places or is a contributing property within a National
506
Register-listed historic district;
507
2. Designated as a local historic landmark, historic
508
resource, or part of a locally designated historic district
509
under a duly adopted local historic preservation ordinance; or
510
3. Subject to binding historic preservation review or
511
approval under federal, state, or local law, including review by
512
a local historic preservation board or commission.
513
(b) If an application encompasses multiple parcels or
514
improvements, this subsection applies only to the portion of the
515
application that relates to property described in paragraph (a).
516
This subsection may not be construed to prohibit the use of a
517
qualified contractor for the portions of an application that do
518
not involve the property listed in paragraph (a).
519
Section 3. Section 166.033, Florida Statutes, is amended
520
to read:
521
166.033 Development permits and orders; development
522
preapplication consulting services program required.—
523
(1)(a) By January 1, 2027, each municipality with a
524
population of 10,000 or greater shall create and implement a
525
program for the purpose of making available development
526
preapplication consultation services at an applicant's request.
527
This subsection may not be construed to affect or require the
528
modification of a municipal program that makes available the
529
same or substantially similar development preapplication
530
consulting services to an applicant for a development permit or
531
development order, including a program that requires mandatory
532
preapplication meetings for specified types of developments, if
533
such municipal program exists on or before July 1, 2026.
534
1. The preapplication consultation services authorized in
535
this subsection are limited to those applications for permits as
536
defined in s. 163.3169.
537
2. The municipality may use a qualified contractor or a
538
qualified contractor firm as defined in s. 163.3169 to fulfill
539
the preapplication consultation services required in this
540
subsection.
541
(b) A development preapplication consultation services
542
program must, at minimum, provide all of the following:
543
1. The minimum information that must be submitted in an
544
application for a permit as defined in s. 163.3169.
545
2. The review and precertification of completeness of the
546
application and all related documents, including site
547
engineering plans or site plans or their functional equivalent,
548
or plats, and their compliance with all relevant existing land
549
development regulations.
550
(c) If an applicant chooses to use the development
551
preapplication consultation services program, the municipality,
552
upon receipt of the proposed development application, shall
553
confirm receipt, verify completeness, and issue a written
554
notification to the applicant indicating that all required
555
information has been submitted, or specify in writing with
556
particularity any deficiencies within 5 business days. If the
557
application is deficient, the applicant has 30 days to address
558
the deficiencies by submitting the required information. If the
559
municipality fails to issue the written notification within 5
560
business days, the application is deemed complete by operation
561
of law without conditions, and the municipality must process the
562
application as required in paragraph (d).
563
(d)1. Upon receipt of the applicant's completed
564
application, the municipality must process the application for
565
final action and must approve, approve with conditions, or deny
566
the application within 45 days after submission of a complete
567
application, except the municipality may not review again those
568
plans specified in subparagraph (b)2.
569
2. If the municipality fails to take final action to
570
approve, approve with conditions, or deny the application within
571
the 45 days, the applicant shall notify the municipality in
572
writing. If the municipality fails to respond within 10 days,
573
the application is deemed approved by operation of law without
574
conditions, and the applicant is entitled to proceed with the
575
proposed activity or development as though the municipality had
576
granted unconditional approval. Approval pursuant to this
577
subparagraph may not be construed to relieve the applicant of
578
the obligation to comply with all other applicable federal,
579
state, and local laws, regulations, and ordinances.
580
(2) If an applicant for a development permit or
581
development order is not eligible, does not request, or elects
582
not to use the municipality's development preapplication
583
consulting services program pursuant to subsection (1), all of
584
the following requirements shall apply:
585
(a)(1) A municipality shall specify in writing the minimum
586
information that must be submitted for an application for a
587
zoning approval, rezoning approval, subdivision approval,
588
certification, special exception, or variance. A municipality
589
shall make the minimum information available for inspection and
590
copying at the location where the municipality receives
591
applications for development permits and orders, provide the
592
information to the applicant at a preapplication meeting, or
593
post the information on the municipality's website.
594
(b)1.(2) Within 5 business days after receiving an
595
application for approval of a development permit or development
596
order, a municipality shall confirm receipt of the application
597
using contact information provided by the applicant. Within 30
598
days after receiving an application for approval of a
599
development permit or development order, a municipality must
600
review the application for completeness and issue a written
601
notification to the applicant indicating that all required
602
information is submitted or specify in writing with
603
particularity any areas that are deficient. If the application
604
is deficient, the applicant has 30 days to address the
605
deficiencies by submitting the required additional information.
606
2. For applications that do not require final action
607
through a quasi-judicial hearing or a public hearing, the
608
municipality must approve, approve with conditions, or deny the
609
application for a development permit or development order within
610
120 days after the municipality has deemed the application
611
complete.
612
3. For applications that require final action through a
613
quasi-judicial hearing or a public hearing, the municipality
614
must approve, approve with conditions, or deny the application
615
for a development permit or development order within 180 days
616
after the municipality has deemed the application complete.
617
4. Both parties may agree in writing or in a public
618
meeting or hearing to an extension of time, particularly in the
619
event of a force majeure or other extraordinary circumstance. An
620
approval, approval with conditions, or denial of the application
621
for a development permit or development order must include
622
written findings supporting the municipality's decision.
624
The timeframes contained in this paragraph subsection do not
625
apply in an area of critical state concern, as designated in s.
626
380.0552 or chapter 28-36, Florida Administrative Code. The
627
timeframes contained in this paragraph subsection restart if an
628
applicant makes a substantive change to the application. As used
629
in this paragraph subsection, the term "substantive change"
630
means an applicant-initiated change of 15 percent or more in the
631
proposed density, intensity, or square footage of a parcel.
632
(c)1.(3)(a) When reviewing an application for a
633
development permit or development order that is certified by a
634
professional listed in s. 403.0877, a municipality may not
635
request additional information from the applicant more than
636
three times, unless the applicant waives the limitation in
637
writing.
638
2.(b) If a municipality makes a request for additional
639
information and the applicant submits the required additional
640
information within 30 days after receiving the request, the
641
municipality must review the application for completeness and
642
issue a letter indicating that all required information has been
643
submitted or specify with particularity any areas that are
644
deficient within 30 days after receiving the additional
645
information.
646
3.(c) If a municipality makes a second request for
647
additional information and the applicant submits the required
648
additional information within 30 days after receiving the
649
request, the municipality must review the application for
650
completeness and issue a letter indicating that all required
651
information has been submitted or specify with particularity any
652
areas that are deficient within 10 days after receiving the
653
additional information.
654
4.(d) Before a third request for additional information,
655
the applicant must be offered a meeting to attempt to resolve
656
outstanding issues. If a municipality makes a third request for
657
additional information and the applicant submits the required
658
additional information within 30 days after receiving the
659
request, the municipality must deem the application complete
660
within 10 days after receiving the additional information or
661
proceed to process the application for approval or denial unless
662
the applicant waived the municipality's limitation in writing as
663
described in paragraph (a).
664
5.(e) Except as provided in subsection (4) subsection (7),
665
if the applicant believes the request for additional information
666
is not authorized by ordinance, rule, statute, or other legal
667
authority, the municipality, at the applicant's request, shall
668
proceed to process the application for approval or denial.
669
(d)(4) A municipality must issue a refund to an applicant
670
equal to:
671
1.(a) Ten percent of the application fee if the
672
municipality fails to issue written notification of completeness
673
or written specification of areas of deficiency within 30 days
674
after receiving the application.
675
2.(b) Ten percent of the application fee if the
676
municipality fails to issue written notification of completeness
677
or written specification of areas of deficiency within 30 days
678
after receiving the additional information pursuant to
679
subparagraph (c)2. paragraph (3)(b).
680
3.(c) Twenty percent of the application fee if the
681
municipality fails to issue written notification of completeness
682
or written specification of areas of deficiency within 10 days
683
after receiving the additional information pursuant to
684
subparagraph (c)3. paragraph (3)(c).
685
4.(d) Fifty percent of the application fee if the
686
municipality fails to approve, approves with conditions, or
687
denies the application within 30 days after conclusion of the
688
120-day timeframe specified in subparagraph (b)2. or the 180-day
689
timeframe specified in subparagraph (b)3. subsection (2).
690
5.(e) One hundred percent of the application fee if the
691
municipality fails to approve, approves with conditions, or
692
denies an application 31 days or more after conclusion of the
693
120-day timeframe specified in subparagraph (b)2. or the 180-day
694
timeframe specified in subparagraph (b)3. subsection (2).
696
A municipality is not required to issue a refund if the
697
applicant and the municipality agree to an extension of time,
698
the delay is caused by the applicant, or the delay is
699
attributable to a force majeure or other extraordinary
700
circumstance.
701
(e)(5) When a municipality denies an application for a
702
development permit or development order, the municipality shall
703
give written notice to the applicant. The notice must include a
704
citation to the applicable portions of an ordinance, rule,
705
statute, or other legal authority for the denial of the permit
706
or order.
707
(3)(6) As used in this section, the terms "development
708
permit" and "development order" have the same meaning as in s.
709
163.3164, but do not include building permits.
710
(4)(7) For any development permit application filed with
711
the municipality after July 1, 2012, a municipality may not
712
require as a condition of processing or issuing a development
713
permit or development order that an applicant obtain a permit or
714
approval from any state or federal agency unless the agency has
715
issued a final agency action that denies the federal or state
716
permit before the municipal action on the local development
717
permit.
718
(5)(8) Issuance of a development permit or development
719
order by a municipality does not create any right on the part of
720
an applicant to obtain a permit from a state or federal agency
721
and does not create any liability on the part of the
722
municipality for issuance of the permit if the applicant fails
723
to obtain requisite approvals or fulfill the obligations imposed
724
by a state or federal agency or undertakes actions that result
725
in a violation of state or federal law. A municipality shall
726
attach such a disclaimer to the issuance of development permits
727
and shall include a permit condition that all other applicable
728
state or federal permits be obtained before commencement of the
729
development.
730
(6)(9) This section does not prohibit a municipality from
731
providing information to an applicant regarding what other state
732
or federal permits may apply.
733
Section 4. Paragraphs (c) and (d) are added to subsection
734
(1) of section 177.071, Florida Statutes, to read:
735
177.071 Administrative approval of plats or replats by
736
designated county or municipal official.—
737
(1)
738
(c) A governing body and its designated administrative
739
authority shall use, upon the written request of the applicant,
740
the registry established in s. 163.3169 to supplement local
741
government staff resources in ways determined by the governing
742
body for processing and expediting the requirements of this
743
section.
744
(d) A local government may not create, establish, or apply
745
any additional local procedure or condition for the
746
administrative approval of a plat or replat under this section
747
which is inconsistent with this section or s. 177.091. If
748
infrastructure financial assurances are required as a condition
749
of plat or replat approval, the administrative authority
750
designated in paragraph (a) must receive and act upon the
751
proposed assurance. The local government shall accept commonly
752
used forms of financial assurance, including performance bonds,
753
letters of credit, and escrow agreements, provided that the
754
assurance is in a form reasonably acceptable to the local
755
government and issued by a financially responsible issuer
756
meeting objective, uniformly applied standards. Local government
757
review of such financial assurance shall be limited to verifying
758
that the amount, form, and issuer satisfy the requirements of s.
759
177.091(8) and (9) and the local government's uniformly applied
760
standards, and may not be used to unreasonably delay approval.
761
If the assurance is deficient, the local government must provide
762
written notice of deficiencies within 10 business days.
763
Section 5. Paragraph (a) of subsection (1), paragraphs (a)
764
and (b) of subsection (2), paragraph (a) of subsection (3),
765
subsection (4), paragraphs (b) and (c) of subsection (6), and
766
subsection (8) of section 177.073, Florida Statutes, are
767
amended, and paragraph (d) is added to subsection (2) of that
768
section, to read:
769
177.073 Expedited approval of residential building permits
770
before a final plat is recorded.—
771
(1) As used in this section, the term:
772
(a) "Applicant" means a homebuilder or developer who files
773
an application with the local governing body to identify the
774
percentage of planned homes, or the number of building permits,
775
that the local governing body must issue for a residential
776
subdivision or one or more phases in a multiphased planned
777
community, subdivision, or planned community.
778
(2)(a) By October 1, 2024, the governing body of a county
779
that has 75,000 residents or more and any governing body of a
780
municipality that has 10,000 residents or more and 25 acres or
781
more of contiguous land that the local government has designated
782
in the local government's comprehensive plan and future land use
783
map as land that is agricultural or to be developed for
784
residential purposes shall create a program to expedite the
785
process for issuing building permits for residential
786
subdivisions or one or more phases in a multiphased planned
787
community, subdivision, or planned communities in accordance
788
with the Florida Building Code and this section before a final
789
plat is recorded with the clerk of the circuit court. The
790
expedited process must include an application for an applicant
791
to identify the percentage of planned homes, not to exceed 50
792
percent of the residential subdivision or a planned community,
793
or the number of building permits that the governing body must
794
issue for the residential subdivision or planned community. The
795
application or the local government's final approval may not
796
alter or restrict the applicant from receiving the number of
797
building permits requested, so long as the request does not
798
exceed 50 percent of the planned homes of the residential
799
subdivision or planned community or the number of building
800
permits. This paragraph does not:
801
1. Restrict the governing body from issuing more than 50
802
percent of the building permits for the residential subdivision
803
or planned community.
804
2. Apply to a county subject to s. 380.0552.
805
(b) Subject to the requirements under paragraph (6)(b), a
806
governing body that had a program in place before July 1, 2023,
807
to expedite the building permit process, need only update its
808
their program to approve an applicant's written application to
809
issue up to 50 percent of the building permits for the
810
residential subdivision or planned community in order to comply
811
with this section. This paragraph does not restrict a governing
812
body from issuing more than 50 percent of the building permits
813
for the residential subdivision or planned community.
814
(d)1. If a governing body fails to adopt a program under
815
paragraph (a) or paragraph (c), or fails to update or modify an
816
existing program as required under paragraph (b), by the
817
applicable statutory deadline, the following will apply without
818
further action or approval by the governing body and
819
notwithstanding any conflicting local requirement:
820
a. The applicant has an unconditional, self-executing
821
right to use a qualified contractor of the applicant's choosing,
822
within the scope of the contractor's professional licensure and
823
as authorized under this section, to perform technical review
824
and certification necessary to support the issuance of up to 75
825
percent of the building permits for the residential subdivision
826
or planned community, including one or more phases thereof,
827
before the final plat is recorded, provided the qualified
828
contractor does not have a conflict of interest. For the
829
purposes of this paragraph, the term "conflict of interest" has
830
the same meaning as in s. 112.312.
831
b. The governing body, local building official, and any
832
local government staff may not condition, delay, limit,
833
restrict, obstruct, or deny the applicant's use of a qualified
834
contractor under this paragraph. This paragraph does not
835
prohibit a local government from applying neutral, generally
836
applicable requirements relating to procurement, contracting,
837
insurance, indemnification, conflict-of-interest review,
838
credential verification, recordkeeping, or public safety,
839
provided such requirements do not materially impair or frustrate
840
the applicant's ability to use a qualified contractor as
841
authorized by this paragraph. Any local requirement that
842
directly conflicts with this paragraph is preempted to the
843
extent of the conflict.
844
c. The qualified contractor may perform all technical
845
review services within the scope of his or her licensure and
846
qualifications which are necessary to obtain such building
847
permits as specifically authorized under this section, including
848
preparing, reviewing, and submitting permit applications and
849
supporting plans, specifications, and documents, and providing
850
signed and sealed documents when required by law. The local
851
building official must accept such submissions when prepared and
852
sealed by the qualified contractor as meeting any local
853
requirement that the submission be prepared or reviewed by local
854
government staff, and must review and issue the permits in
855
accordance with the Florida Building Code and applicable state
856
law. This paragraph does not limit the authority of the local
857
building official to review such submission by a qualified
858
contractor for compliance with the Florida Building Code and
859
applicable state law, to identify deficiencies, or to approve or
860
deny the permit in accordance with the law.
861
d. The governing body and the local building official may
862
not unreasonably require the applicant or the qualified
863
contractor to use a local government registry, rotation, or
864
shortlist, or any other selection or vetting process, which has
865
the effect of denying or materially delaying the applicant's use
866
of a qualified contractor under this section.
867
e. The unconditional right provided by this paragraph
868
becomes effective immediately upon the governing body's failure
869
to meet the applicable deadlines in paragraph (a) or paragraph
870
(c), continues in effect unless and until the governing body has
871
adopted or updated a program fully compliant with this section,
872
and may not be limited, impaired, or applied retroactively to
873
reduce the number or percentage of building permits the
874
applicant may obtain or is eligible to obtain under this
875
paragraph.
876
2. This paragraph may not be construed to limit or impair
877
the authority of the local building official to enforce the
878
Florida Building Code, the Florida Fire Prevention Code, or
879
other applicable state laws and local laws of general
880
application in reviewing and issuing building permits; however,
881
the governing body and the local building official may not
882
impose any additional local procedures, prerequisites, or
883
substantive standards on the applicant or the qualified
884
contractor which have the effect of conditioning, delaying,
885
restricting, or denying the use of a qualified contractor as
886
authorized by this paragraph.
887
(3) A governing body shall create:
888
(a) A two-step application process for the adoption of a
889
preliminary plat, and for stabilized access roads that can
890
support emergency vehicles, inclusive of any plans, in order to
891
expedite the issuance of building permits under this section.
892
The application must allow an applicant to identify the
893
percentage of planned homes or the number of building permits
894
that the governing body must issue for the residential
895
subdivision, or planned community, or one or more phases of a
896
multiphased planned community or subdivision.
897
(4)(a) An applicant may use a private provider or
898
qualified contractor in the same manner as provided in pursuant
899
to s. 553.791 to expedite the application process for building
900
permits after a preliminary plat is approved under this section.
901
(b) A governing body shall, upon the written request of
902
the applicant, use the qualified contractor registry established
903
in s. 163.3169 establish a registry of at least three qualified
904
contractors whom the governing body may use to supplement staff
905
resources in ways determined by the governing body for
906
processing and expediting the review of an application for a
907
preliminary plat or any plans related to such application. A
908
qualified contractor on the registry who is hired pursuant to
909
this section to review an application, or any part thereof, for
910
a preliminary plat, or any part thereof, may not have a conflict
911
of interest with the applicant. For purposes of this paragraph,
912
the term "conflict of interest" has the same meaning as in s.
913
112.312.
914
(6) The governing body must issue the number or percentage
915
of building permits requested by an applicant in accordance with
916
the Florida Building Code and this section, provided the
917
residential buildings or structures are unoccupied and all of
918
the following conditions are met:
919
(b) The applicant provides proof to the governing body
920
that the applicant has provided a copy of the approved
921
preliminary plat, along with the approved plans, to the relevant
922
electric, gas, water, and wastewater utilities. For purposes of
923
this paragraph, the term "approved plans" means plans approved
924
for design and permit review and does not include, and may not
925
be construed to require or imply, any certification,
926
attestation, or confirmation of the completion of construction
927
of any subdivision or planned community infrastructure, or
928
improvements depicted in, referenced by, or required under such
929
plans, except for the construction of the minimum access and
930
roadway improvements required by the Florida Fire Prevention
931
Code for fire department access and operations, such as a
932
stabilized roadway for emergency access. No other subdivision or
933
planned community infrastructure or improvements may be required
934
to be constructed as a condition of building permit issuance or
935
approval authorized under this section.
936
1. A local government may not condition, delay, withhold,
937
or deny the issuance of any building permit authorized under
938
this section on:
939
a. The actual completion, substantial completion, or
940
physical installation of any subdivision or planned community
941
infrastructure, or improvements identified in the approved
942
preliminary plat or approved plans;
943
b. The submission, acceptance, or approval of any
944
certification of completion or similar documentation, including,
945
but not limited to, certificates of completion or substantial
946
completion, engineer's or architect's certifications of
947
completion, as-built or record drawings, pressure or compaction
948
test results, utility acceptance letters, service availability
949
letters, or similar confirmations of finished construction or
950
readiness for service; or
951
c. Compliance with an environmental condition which is not
952
required by its land development regulations, a local government
953
comprehensive plan, a regulatory covenant or similar recorded
954
instrument, a decision or order by a local zoning board or other
955
quasi-judicial board, or by state law or federal law to obtain a
956
building permit.
957
2. This prohibition applies notwithstanding any ordinance,
958
resolution, policy, practice, permit condition, concurrency or
959
proportionate-share requirement, interlocal agreement, utility
960
policy or standard, or other local requirement to the contrary.
961
3. This paragraph may not be construed to prohibit a local
962
government from requiring documentation strictly necessary to
963
demonstrate compliance with the Florida Fire Prevention Code as
964
a condition of issuing building permits; however, such
965
documentation may not require the physical completion of the
966
subdivision or planned community infrastructure, or improvements
967
beyond what is expressly required to satisfy the Florida Fire
968
Prevention Code.
970
This paragraph may not be construed to relieve an applicant from
971
completing or installing any infrastructure or improvements as a
972
condition of issuance of a certificate of occupancy.
973
(c) The applicant holds a valid performance bond for up to
974
130 percent of the necessary improvements, as defined in s.
975
177.031(9), that have not been completed upon submission of the
976
application under this section. For purposes of a master planned
977
community as defined in s. 163.3202(5)(b), a valid performance
978
bond is required on a phase-by-phase basis. For purposes of this
979
section, a local government may waive the bond requirement in
980
this paragraph through its program or on a case-by-case basis
981
upon request of the applicant.
982
(8) For purposes of this section, an applicant has a
983
vested right in a preliminary plat that has been approved by a
984
governing body for the earlier of at least 5 years or if all of
985
the following conditions are met:
986
(a) The applicant relies in good faith on the approved
987
preliminary plat or any amendments thereto.
988
(b) The applicant incurs obligations and expenses,
989
commences construction of the residential subdivision or planned
990
community, and is continuing in good faith with the development
991
of the property.
992
Section 6. This act shall take effect July 1, 2026.